Tag Archives: Demolition

Minto Westside is having a Demolition Sale!

Our Sales Centre is moving… to make way for construction!

Demolition title

Our Sales Centre at Front and Bathurst will be relocating to 700 King Street West to make way for the start of construction at Minto Westside. To celebrate, we are offering incredible pre-construction pricing and limited-time incentives for one weekend only! Don’t miss this smashing opportunity to own at Minto Westside and take advantage of the best value in King West.

On Saturday March 19th and Sunday March 20th from 12-5 pm ,we are offering a Free $500 Porter Airlines Gift Certificate with every purchase of a new condo*, plus daily door prizes to visitors!

PLUS this weekend only we are offering these incredible limited time incentives:

5% Interest on your deposit* and 1-Year Rental Guarantee*, plus an investor services package:

  • Complimentary Property Management Services
  • Free HST  Rebate Services*
  • PDI Services
  • Free Home Insurance*
  • Complimentary Colour Selection

OR

Cashback Offer:

  • $15,000 off 2 bed suites**
  • $10,000 off 1 bed and 1 bed plus den suites**
  • $5,000 off studios**

It’s going to be a busy final weekend at our 25 Bathurst Street Sales Centre, so be sure to come early to take advantage of these fabulous incentives and prizes!

After this weekend, you can find us at our brand new Condo Gallery at 700 King Street West, starting March 26th.

It’s an exciting time at Front and Bathurst with so much activity on site as we prepare for construction! We’re thrilled to see the beginnings of Minto Westside start to take shape!

*Interest to be paid as a credit on close. Interest will be paid up to original scheduled occupancy date. Prices and specifications are subject to change without notice. Conditions apply. See Sales Representative for details. Studios excluded. **See Sales Representative for details. E.& O.E. Minto Communities Inc.

Demolition in Yorkville

If you’ve been by the intersection of Cumberland and Bellair lately, you will have noticed that the old office building is coming down as we start to prepare for the construction of Minto Yorkville Park!

Demolition of a structure like this takes careful planning and execution and the demolition team is following a step-by-step engineered process to bring down the old building at 94 Cumberland.

Minto Yorkville Park

The first step of the process was considered largely non-structural & prepatory partial demolition. The demolition crew removed and disposed of any unnecessary equipment and materials including non-structural walls throughout the building.  An opening was cut through each floor to erect the tower crane that will assist in the demolition process such as removing the exterior precast panels of the building as well as bringing down debris.

Minto Yorkville Park

Next, the demolition contractor will begin to lower the building to the top of the third floor slab using small demolition equipment, which will be operated on the floors of the building. The remainder of the building will be demolished to ground level using demolition excavators equipped with shear, grapple and hammer attachments.

Minto Yorkville Park

Once the building has been leveled to grade, the crew will demolish and remove the existing foundation of the building, demolishing while backfilling to facilitate the start of excavation & shoring for Minto Yorkville Park.

We’re looking forward to seeing the progress on site at Minto Yorkville Park! We’ll continue to keep you in the loop on construction as the building starts to take off.

Do you want #24KaratLiving in Yorkville? We have suites available starting from the low $400s. Contact us today or come in and visit us at our sales centre at 101 Yorkville Ave